IuVe Avatar
Describe an objective in plain language. Phase C.2 wires Avatar to the local agent / Orchestra.
IuVeAI can make mistakes. Confirmations may require the Linux console or Connect until C.3.
Code Editor
Open Folder workspace · multi-tab · Monaco · LSP (Phase 4 Stage D3).
LSP idle
Terminal
Workspace shell under Open Folder · safety blocklist · confirm for risky commands (Phase 4 Stage D4).
Terminal idle
Git
Open Folder repository · status / diff / commit / push (Phase 4 Stage D5). Force push not available.
Git idle — open a folder that is a git repo.
Problems
Verify after edits · LSP diagnostics + project check (Phase 4 Stage D6). Not a debugger.
No verify run yet — patch code or Run verify.
Debug
Breakpoints under Open Folder — Python, JavaScript, TypeScript (Phase 4 Stage D9). Local runners, not full DAP.
Set a breakpoint, then Start. On pause the editor focuses the line.
No breakpoints
Debug idle
Dashboard
Overview placeholder — Phase C.2+.
Devices
Pairing / device list placeholder — use Connect web if needed.
Diagnostics
Loading…
Security
Permission presets (admin-first). Full grant UI opens in Connect.
Updates
Loading…